Process Assets by SW-CMM® KPA Archive
The SW-CMM® has been
replaced by CMMI®.
SW-CMM® process assets will be retained as an archive, but will not be
maintained after December 31, 2003. This page has been replaced by the
Process
Assets by CMMI® PA
page.
Supporting Information
Notes
-
Click on a Key Process Area (KPA) link to go to that section.
-
CMMI® PA corresponding to this SW-CMM®
KPA.
-
Link to the Software Engineering Institute Web site, from which you can
download a PDF version of this document.
-
® Capability Maturity Model, SW-CMM, and CMMI are registered in the U.S. Patent and
Trademark Office by Carnegie Mellon University.
Level 2 (Repeatable) Key Process Areas
Requirements Management (RM)
Policy
Processes
- Requirements
Management Process (Expert Mode)
Tools
Notes
-
This is an edited version of the Requirements Management Guidebook
from the Naval Air Warfare Development
Center.
-
For additional information see Requirements Management Guidebook1
and INCOSE Requirements Management
Tools Survey.
Software Project Planning (SPP)
Policy
Plans
Software Transition Plan (STrP) Template
Processes
Training
Tools
Instructions
for Using the Schedule Templates
-
Download & save schedule-estimation template.
-
Open file using MS Project 98 (or higher).
-
Change project information (e.g., project start date, project name, etc).
-
Edit the resource sheet using the real names of project team members.
-
Review work/requirements to be done; enter task durations, resource names, and
units accordingly.
-
Review / adjust as required (to ensure a reasonable schedule).
-
Review / adjust
resource
allocations and project durations with project team and sponsor as required.
For further information and/or assistance with the schedule template please
contact SEPO.
SEPO Library
-
Computer Resources Life Cycle Management Plan (CRLCMP) SECNAVINST 5000.21
Computer Resources Life Cycle Management Plan (CRLCMP) SPAWARINST 5200.22M
Guide for Developing Computer Resources Life Cycle Management Plan (CRLCMP)
Notes
-
For additional information see:
Software Project Tracking and
Oversight (SPTO)
Policy
Processes
Procedures
Tools
Notes
- For additional information see:
Software Subcontract Management (SSM)
Policy
Processes
Notes
-
These documents are courtesy of the NAVAIR TEAM Software Subcontractor Management Working Group.
-
COTS process and COTS related links. The same link appears under SPP, SSM,
and SPE since COTS information may be needed during planning, contracting, or
engineering activities.
-
For additional information see:
Software Quality Assurance (SQA)
Policy
Processes
Tools
SEPO Library
- AN/SQQ-89(V) Tactical Decision Support Subsystem Phase I SQPP
Notes
-
Contains testing process, test forms, and checklists.
-
For additional information see:
Software Configuration Management (SCM)
Policy
Plans
Processes
Procedures
Training
Tools
SEPO Library
-
COMPASS SCMP
-
STAFS Project PCA and FCA Procedures
Notes
- For additional information see:
Level 3 (Defined) Key Process Areas
Organization Process Focus (OPF)
Policy
Plans
Organization Process Definition (OPD)
Policy
Processes
Procedures
Tools
SEPO Library
-
Costs and Benefits of Software Process Improvement
Notes
-
This document contains a description of the SSC Pacific software process assets, standard software process, process tailoring guidelines, and approved life
cycles.
-
Projects are encouraged to incorporate their
process improvement plans and tasking into their project plans (e.g. SDP, PMP).
SPI plans and tasking should not be treated separately from other project
tasking.
-
For additional information see
Standard Process
Assets Architecture Definition (SPAA Volume 1)1.
Training Program (TP)
Policy
Plans
Processes
Tools
Notes
-
For additional
information see:
Integrated Software Management (ISM)
Policy
Plans
Organizational Program Management Plan
The following document is presented as a generic model of an Organizational Program Management Plan (OPMP), addressing topics required to achieve Level 3 on the
SW-CMM®. The objective is to assist organizations in documenting "a compliant management structure, the assignment of management responsibility, management processes, and establishing the software engineering disciplines needed to support the various projects under their cognizance."
Users should first review the model OPMP to ensure an understanding of its scope, management functions, relationships, and responsibilities for the positions within the model organization. It is important to understand that the OPMP's sample organization and management processes do not fit all organizations. Rather, the model OPMP serves as a representative means of defining an organization. Therefore, it is understood that this model will require tailoring to meet specific organizational needs.
Tools
Software Product Engineering (SPE)
Policy
Processes
Tools
SEPO Library
-
Reuse Adoption Guidebook
-
Software IV&V AFSC/AFLC Pamphlet 800-5 5/20/88
-
IEEE Guide for Software V&V Plans 1059-1993
Notes
-
COTS process and COTS related links. The same link
appears under SPP, SSM, and SPE since COTS information may be needed during
planning, contracting, or engineering activities.
-
For additional information see:
Intergroup Coordination (IC)
Policy
Processes
Training
Guidelines for Successful Teams Workshop
Attachments
Team Evaluation
Notes
-
Additional information on Intergroup Coordination can be found in the example
Organization Project Management Plan, which can be found in the ISM KPA.
-
Tips on conducting a successful meeting can be found in the Keys to a Successful Review/Meeting Brief, which can be found in the
SPTO KPA.
Peer Reviews (PR)
Policy
Processes
Procedures
Tools
Notes
-
"Analysis of 148 Formal Inspections revealed that each person will spend 19
minutes per page finding an error every 2.8 pages. So a team of 5
inspectors working on a 50 page document will yield 89 errors while using 16 hours per
person."
-
The Formal Inspection
Process has been incorporated into, and combined with, the Peer Review Process.
The standalone Formal Inspection Process V 2.2 is obsolete.
-
This form can be used with any form of peer review and is
similar to the Peer Review Defect Log (Form 2), but in MS Excel format.
-
For additional information see:
Level 4 (Managed) Key Process Areas
Quantitative Process Management (QPM)
Policy
Notes
- For additional information see the Organizational Measurement Guide.
Software Quality Management (SQM)
Policy
Level 5 (Optimizing) Key Process Areas
Defect Prevention (DP)
Policy
Technology Change Management (TCM)
Policy
Process Change Management (PCM)
Policy
Last Update: October 28, 2009 |